Modern Office Strandards Poland 2020

Modern Office Standards Poland 2020 / Rolfe Judd / CBRE /

Table of Contents

3 / Criteria Overview

B1 Landmark status (AD)

21 15 13 25 31 28 41 39 45 46 50 49 55 57 53 51 59 71 66 63 74 80

B3 Lobby / reception (OB) B4 Common provision (OB) B2 Internal layout and grids (AD) B6 Car parks and servicing (OB) B5 Wellbeing (incl. greenery) (AD)

/ CBRE / Rolfe Judd / Modern Office Standards Poland 2020

Table of contents /

B7 Lift service (OB)

1 / Foreword

/ Table of contents

B8 Ceilings and lighting (OB)

3

B9 Small power (OB) B10 BMS systems (OB)

2 / Criteria Overview

A1 Quality criteria Building stature Building space

7 7 7 8 9 9 9

B11 Structured cabling (OB)

B12 Tenants’ plant space provision (AD)

B14 Raised floors (OB) B13 Power supplies (OB)

Building technical Building comfort

B15 Structure (OB)

B16 Building maintenance (AD)

Building sustainability Quality criteria summary

B18 Daylighting (AD) B17 Amenities (AD)

A3 Classification table A2 Location criteria

12 11

B19 Heating, cooling and ventilation (OB)

B20 Noise (OB)

B21 Sustainability standards for design and construction (OB)

B22 Sustainability standards for the operation and maintenance of a building (AD)

4 / Location Criteria

83

5 / Appendix

C1 Measurement

93 91 85

C2 Statutory requirements’ reference

C3 Standards score card

2

6 / Company Profiles

97

/

Made with FlippingBook - professional solution for displaying marketing and sales documents online