Modern Office Strandards Poland 2020
Modern Office Standards Poland 2020 / Rolfe Judd / CBRE /
A comprehensive building management system (BMS) is recommended as the best way to monitor or control the operation of the building functions.
/ CBRE / Rolfe Judd / Modern Office Standards Poland 2020 / 45 B9 Small B9 / Small power Recommendation:
BMS systems / B10
B10 BMS Systems (OB) Class A buildings require a high degree of con- trol to run efficiently and with flexibility to suit the requirements of a wide range of different tenants.
Power (OB)
Minimum recommended small power requirements are provided below.
A comprehensive Building Management System (BMS) is recommended as the best way to monitor or control the operation of the building functions.
Recommendation:
Small Power Requirements (loading diversified): • LED Lighting: 8–10 W/ sq m • Office equipment and air conditioning: 40–50 W/ sq m • Common area installations (lifts, ventilation, domestic water installation etc.) depend- ing on building height : 10–20 W/ sq m.
It is recommended to install a BMS to monitor or control the following:
• Internal environment — heating / cooling / lighting in an easily zoned fashion • Central security and access control • Fire alarms and access for fire brigade at ground level • Overall energy efficiency • Secure a possibility to include tenant’s own applications (e.g. Access Control App., Employee Entrance Counting App.) to the building’s BMS
In order to obtain all power demand for office building (HVAC with smoke exhaust instal- lation, sprinkler installation, domestic water installation, lighting etc.) 60–80 W/ sq m is designed as a typical power demand.
Some spare ways at riser distribution boards shall also be provided.
46
/
Made with FlippingBook - professional solution for displaying marketing and sales documents online